You will need building help and a large construction dumpster for debris.
Framing a new roof into an existing roof.
Wrapped up framing to get roof ready for sheathing.
The bottom of our blind valley was about 30 inches short of the bottom of the porch roof so we extended the line of the valley down to the edge of the new roof.
You may need a structural engineer to help with design of trusses and rafters.
How to tie a additions roof to existing roof roof additions to existing roofs how to construct a roof from an exsisting shead how to change a roof line how to attach a deck roof to existing roof how to add a roof over porch attache porch roof on house attach shed roof to house adding a roof to screened in porch adding a roof to existing.
However you must ensure the new porch roof matches with your existing roof seamlessly to enjoy these benefits.
It does not only protect you from the heat and rain but it also accentuates your house.
However the glare of the sunlight or the pouring rain will ruin it.
Https amzn to 38xt1eh or donate to suppor.
Tying a gable roof into an existing roof is a long expensive project usually undertaken only when there is a major addition or renovation to a house.
Fasten a ridge board on the new roof if there is one to the ridge board on the existing roof if it has one.
After the shed roof framing is complete finish the lean to along with any part of the existing roof from which you ve removed shingles with new shingles to blend the lean to into the old roof.
Re lay the shingles you removed from the existing roof.
It is not a job for beginners.
Read on to find out how to attach a patio roof to an existing house.
Things needed 2 by 6 2 by 8 or 2 by 4 inch framing lumber.
Bed the end of each shingle in a 2 in wide ribbon of roofing cement placed 4 in.
Therefore you need to install a patio roof.
To do this we had to extend the plane of the shed roof out over the porch roof creating a small triangular extension of the existing roof.
Up from the valley center.
Shingle the addition roof letting the new shingles fold through the valley center and onto the old roof deck by at least 1 ft.